|
|
Resource Summary & Technical Reports
|
|
Consolidated Resource Summary |
|
Resource Type |
Resource (Tonnes) |
Contained Metal Resource |
Grades |
|
Ag (oz) |
Pb (t) |
Zn (t) |
Ag Equivalent (oz) |
Ag (g/t) |
Pb (%) |
Zn (%) |
|
Measured |
1,702,377 |
16,555,167 |
85,509 |
37,639 |
211,128,643 |
- |
- |
- |
|
Indicated |
11,478,618 |
84,416,131 |
370,518 |
286,900 |
- |
- |
- |
|
Inferred |
14,198,806 |
116,087,193 |
633,339 |
336,362 |
270,279,520 |
- |
- |
- |
|
Resource Estimates at Individual Mines |
|
Ying Mine |
Measured |
263,943 |
9,174,798 |
47,909 |
25,458 |
19,160,704 |
1,071 |
17.77 |
8.58 |
|
Indicated |
1,785,902 |
41,225,524 |
200,540 |
85,168 |
81,764,436 |
718 |
11.23 |
5.54 |
|
Inferred |
1,978,892 |
66,254,489 |
349,720 |
122,480 |
143,097,751 |
1,128 |
19.01 |
7.57 |
|
|
|
HPG Mine |
Measured |
35,226 |
132,794 |
2,174 |
261 |
553,359 |
117 |
6.28 |
1.28 |
|
Indicated |
166,661 |
357,887 |
5,859 |
502 |
1,901,060 |
67 |
3.52 |
0.30 |
|
Inferred |
1,513,222 |
5,824,580 |
101,017 |
32,906 |
28,250,515 |
120 |
6.68 |
2.17 |
|
|
|
TLP Mine |
Measured |
910,811 |
3,483,248 |
26,009 |
- |
7,226,666 |
119 |
2.86 |
- |
|
Indicated |
3,247,978 |
15,132,435 |
70,334 |
- |
25,207,201 |
145 |
2.17 |
- |
|
Inferred |
2,708,161 |
12,417,352 |
64,910 |
- |
21,693,963 |
143 |
2.40 |
- |
|
|
|
LM Mine |
Measured |
118,397 |
967,327 |
2,567 |
- |
1,354,959 |
254 |
2.17 |
- |
|
Indicated |
244,077 |
2,009,885 |
5,075 |
- |
2,797,058 |
256 |
2.08 |
- |
|
Inferred |
106,531 |
816,572 |
3,122 |
- |
1,274,891 |
238 |
2.93 |
- |
|
|
|
GC Project |
Measured |
374,000 |
2,797,000 |
6,850 |
11,920 |
5,383,300 |
233 |
1.83 |
3.19 |
|
Indicated |
6,034,000 |
25,690,400 |
88,710 |
202,230 |
65,779,900 |
132 |
1.47 |
3.35 |
|
Inferred |
7,892,000 |
30,774,200 |
114,570 |
213,380 |
75,962,400 |
121 |
1.45 |
2.70 |
Notes:
(1) Resource estimates on Ying and HPG from August 2007 NI43-101 Report and on TLP and LM from November 2008 technical report. EQ-Silver is based on metal prices of Ag US$6.50/oz, Pb US$0.40/lb, Zn US$0.45/lb.
(2) Resource estimates on GC project is from June 2009 NI43-101 Technical Report.
(3) Ag Equivalent for the GC project is calculated internally by Silvercorp based on numbers from the June 2009 NI43-101 Technical Report using metals prices of US$12/oz Ag, US$0.75/lb Pb and US$0.75/Zn. Recoveries used in the calculations are 84.82%, 84.57% and 88.42% for Ag, Pb and Zn, respectively.
Technical Reports
2009 GC
2008 TLP/LM
2008 GC/SMT
2007 Ying/HPG
2006 Ying
|